Glossary

Glossary

AIT
An indicator of Average Interruption Time in the power transmission system; expressed in minutes per year, it is a product of 60 and energy not supplied (ENS) by the power system, divided by the average power supplied by the transmission system, expressed in MW.
ATC allocation method
A method of capacity calculation and allocation on the border between systems or zones, where commercial volumes of capacity are offered on the basis of arrangements made between operators of two neighbouring bidding zones in the period prior to capacity allocation (i.e. before the capacity auction), taking into account physical properties of the zones and having regard to congestions and expected demand for trading capacity.
CACM
Capacity Allocation and Congestion Management
CEE
Central and Eastern Europe region
CERT PSE
PSE Computer Emergency Response Team
CI
Critical infrastructure
CJI
Central Investment Unit (Centralna Jednostka Inwestycyjna)
CM
Capacity market
Company
PSE
construction without outages
Construction in the course of which there are no outages for the purposes of construction and off-line commissioning of equipment (i.e. prior to connection to the power network). Construction without outages involves the use of technologies, work organisation and methods of construction and conversion of existing facilities which allow the construction site to be situated outside the energised area. In practice, this can mean the construction of a new substation or switchyard in a new area (purchased where necessary) or the construction of a new facility on the site of an existing one in a manner that does not interfere with operating equipment.
Co-optimisation
Simultaneous procurement of energy and reserves.
CORE
A region created by merging the CEE and CWE regions.
CORE CCR
The Core Capacity Calculation Region
CWE
The Central-West Europe region
DAM
Day Ahead Market
downtime
A period when full functionality of a network infrastructure element is not available, resulting in: outage of a current circuit, outage of an optical fibre link (no transmission) or limiting the functionality of a current circuit or an optical fibre link. In the case of a power line, the current circuit and the optical fibre link are each a network infrastructure element. The contractor is responsible for the downtime of any network infrastructure element subject to construction or conversion, irrespective of the scope of such construction or conversion that should be delivered as the object of the contract, excluding however any responsibility for outages of the components of such element which constitute the contracting authority’s supplies (if applicable). The absence of full functionality resulting in the outage of a current circuit or outage of an optical fibre link means that a situation has arisen for that circuit or path, resulting from causes other those related to network operation management, due to which it is not possible to use this circuit or link.
DSO
Distribution system operator
DSR IP
DSR Intervention Programme
DYSU
The transmission equipment availability factor – DYSU – is calculated as the arithmetical average of availability factors for 5 groups of transmission equipment including groups of lines and transformers installed at our substations. The availability of each of those equipment groups is calculated as the ratio of the actual working time of transmission equipment (in hours) during a year to the nominal number of hours in a year. The DYSU factor is designed to monitor the readiness of transmission network elements to provide the electricity transmission service and takes into account the availability of the following 5 groups of transmission equipment: 1. Category L1 lines; 2. Category L2 lines; 3. Category LB generator outgoing lines; 4. Transformers at Category S11 substations; 5. Transformers at Category S22 substations;
EC
European Commission
EHV
Extra high voltage
EMF
Electromagnetic field
ENS
An indicator of electrical energy not supplied by the power transmission system. Expressed in MWh per year, it represents a sum of products of power not supplied due to interruption and its duration. The indicator includes short, long and very long interruptions, including or excluding catastrophic interruptions.
ENTSO-E
European Network of Transmission System Operators for Electricity
ERO
Energy Regulatory Office
ES
Electrical substation
EU
European Union
EV
Electric vehicle
FBA
Flow-Based Allocation
FBA MC
Flow-Based Market Coupling
GRI Standards
Global Reporting Initiative Standards
HSEQ
Health and Safety, Environment and Quality
HV
High voltage
ICT
Information and Communication Technology
IDM
Intra-Day Market
IoT
Internet of Things
IRiESP
Transmission Network Code (Instrukcja Ruchu i Eksploatacji Sieci Przesyłowej)
IT
Information Technology
JWCD
Centrally Dispatched Generating Units (Jednostki Wytwórcze Centralnie Dysponowane)
LV
Low voltage
Main location of the organisation
Head Office based in Konstancin-Jeziorna
MV
Medium voltage
MW
Megawatt
NCBiR
National Centre of Research and Development (Narodowe Centrum Badań i Rozwoju)
NEMO
Nominated Electricity Market Operator. An entity designated by the President of ERO or a competent regulatory authority in another member state to perform tasks related to Single Day-Ahead or Single Intraday Coupling.
nJWCD
Non-Centrally Dispatched Generating Unit (jednostka wytwórcza niebędąca jednostką wytwórczą dysponowaną centralnie).
ODM
Area Dispatch Centre (Obszarowa Dyspozycja Mocy)
ORed
Reduction facilities (obiekty redukcji)
ORM
Operating Capacity Reserve (Operacyjna Rezerwa Mocy)
OT
Operational Technology
PEC
Prosumer Energy Cloud
PPS
Polish Power System, also referred to as "power system"
PSE CG
PSE Capital Group
PSE ZKO locations
Locations of field subunits (zamiejscowe komórki organizacyjne) in Warsaw, Radom, Katowice, Poznań and Bydgoszcz.
PZI
Investment Projects Plan (Plan zamierzeń inwestycyjnych)
RCM
Reliability Centred Maintenance
RCN
Regional Supervision Centre (Regionalne Centrum Nadzoru)
Redispatching
A measure activated by one or more system operators where the generation or load pattern is changed in order to change physical flows within the transmission system and reduce congestions.
Report compilation date
16 December 2019
RES
Renewable Energy Sources
ROC
Regional Operation Centre
RSCI
Regional Security Coordination Initiatives
SIDC
Single Intraday Coupling. A process in which orders placed are matched in a continuous manner and simultaneously cross-zonal capacity is allocated to different bidding zones in the Intraday Market.
SwePol
Poland-Sweden interconnection
TSC
Transmission System Operators Security Cooperation; an initiative established in December 2008 whose objective is to improve the operational security of the interconnected power systems in Central Europe through the intensification of cooperation between operators.
TSCNET
TSCNET Services GmbH, a company whose activities include the services of technical support to transmission system operators in operational planning processes and support in carrying out concept work under the regional initiative TSO Security Cooperation. The shareholders of TSCNET Services are a dozen or so European transmission system operators.
TSO
Transmission system operator, also referred to as "operator".
TSO
Technical system owner
WCD
Electricity supply continuity index (wskaźnik ciągłości dostaw)
XBID Platform
IT trading platform for cross-border Single Intraday Coupling, based on a central IT system connected with local trading systems of NEMOs and Transmission System Operators, supporting Single Intraday Coupling.
XBR
Bilateral redispatching
ZKO
Field units of PSE and field job positions of PSE units in Bydgoszcz, Katowice, Poznań, Radom and Warsaw.